The Morgan Resort
HVAC systems installation (Daikin VRV IV System & Exhaust System)
Location: Beacon Hills, Saint Maarten (Duch Side)












Aruba Airport Hotel & Business Center
Application of Fireproofing in the entire metal structure of the Airport Hotel & Business Center Aruba.r.
Location: Aruba.
Acqua Condominium Aruba
Daikin VRV HVAC System installation.
BMS system, measurement of energy consumption, measurement of water consumption, energy efficiency, register of occupation.
BIM modeling.
Location: Aruba.







Turks & Caicos Islands
Installation and start-up of Chiller 370ton.
Location: Turks and Caicos Islands.
Club Med Punta Cana
300 TR air-cooled chiller removal.
Installation and start-up of DAIKIN 300 TR chiller.
Installation and start-up of DAIKIN 300 TR chiller.
Piping and cabling of the entire refrigeration system.
Location: Punta Cana, República Dominicana





Hotel Ritz Carlton Aruba
HVAC system design, thermal load calculations, chiller, piping, pumps, for the refurbishment of the Ritz Carlton Hotel, located in the Netherlands Antilles Aruba, with the renowned designer Eng. Francisco Vidal.
Location: Aruba, Antillas Holandesas.
Caribbean University College
Descripción: BMS Integration.
Location: Kingston, Jamaica.

Reliable and secure commercial HVAC repair services. Integral Services Corp supports building managers in ensuring a safe and healthy environment within their industrial and commercial facilities.